value entry posting date differ when we run"cost post to g/l

pravin_mpravin_m Member Posts: 67
edited 2014-07-11 in NAV Three Tier
hello every body,

i am using NAV2009SP1, my problem is that when we run the adjust item cost batch and cost post to g/l batch then adjustment entry post in current date in value entry table.

thanks in advance.

regard
Pravin Maheshwari

Comments

  • pravin_mpravin_m Member Posts: 67
    MVP reply
    Pravin Maheshwari
  • pravin_mpravin_m Member Posts: 67
    MVP reply
    Pravin Maheshwari
  • ssinglassingla Member Posts: 2,973
    Check the dates as per User Setup and General Ledger Setup for the user running the batch job.
    CA Sandeep Singla
    http://ssdynamics.co.in
  • pravin_mpravin_m Member Posts: 67
    ssingla wrote:
    Check the dates as per User Setup and General Ledger Setup for the user running the batch job.
    Thanks for reply

    in user setup date is 01.04.14 to 31.03.15 and general ledger setup date is current date
    Pravin Maheshwari