Hi,
The planning engine creates multiple work orders one for top assembly and rest for sub assemblies. All have routing defined. Components are tied to the operations through routing link codes. I am using manual flushing.
routing setup times will be posted for each sub assembly work orders & the top assembly WO. My concern is how would we roll up the sub assembly times to the top assembly routing. Sub assembly will hv total operation time & top assembly routing will hv assembling times for main assembly.
0
Comments
As i understand, all sub-assemblies be produced and brought to stock. Sub assemblies be then consumed for the parent/top assembly. This will include the rolled up labour cost to the parent assembly.
Is there a report in nav tht gives total(parent+sub-assembly) build duration/cost with operations?